Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if the length and breath of footing is 1.2m x 1.2 m what
will be the length and breath of foundation trench

Answer Posted / protin rabha

Not correct at all. We have to consider extra length and breadth for centering and shuttering also. At least 30 cm both side. So, if footing size is 1.2×1.2m then plus .30m extra both side. Which means size of foundation trench will be 1.5×1.5m. And PCC size can be taken as 150mm extra both sides, which will be 1.35×1.35m PCC size.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM

1951


pile load testing procedure

2203


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3758


show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water

2059


1m square 20mm plastering how much of water need curing work

1884


Why should you show Client/Engineer activities clearly on the project plan?

2396


What is dead load impact load live load

1933


Moisture content calculation for diff mix ratio's ??

1747


how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

2057


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

2240


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1922


Define What is the meaning of a blue land surveyors flag?

1207


what is modular brick and it size

1711


How to construct a water sump in a rocky soil?

2200


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

2079