Answer Posted / safiruddin khan
Ganeraly lap length is depend on load (dead load & live load ) .
It shoud be 40D to 60D (+2.5% to 5%) safety factor.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how to stop beam concrete between column
Which prize is the alternative to the NOVEL Prize?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
What are wooden shingles?
WHAT DLC DESIGN IN CONSTRUCTION
Define Workability ?
Test procedure of fly ash bricks as per code ?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
(Project Management Topic) What are the important criteria in the successful realization of the project?
what is total volume of ingredients used in concrete accordingly
Define angular dimension?
What ingredients with% found in ppc cement??
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...