How to check percentage of bulkage of sand in RCC?
Answer Posted / sai
By proctor test we can find dry density,and water content by any mtd like cal. Carbide then by using formula we can find bulk density
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
How much cement,sand,bricks and water needed for 1square metre brick work?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Minimum concrete cover in slabs, columns, beams, foundation and other st?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
How to increase a bearing capacity of soil?
Exterior Joints,define
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
to minimize budget cost of building , what can i do
In block work seawalls what is the purpose of slip joints?
reinforcement slab, beam and column formulas?