If MRP type PD/ND in material master how will work flow.?
Answer Posted / sash
PD : Relevance of material requirement planning.
ND : Not Relevance of material requirement planning.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Explain what happens to planned after it has been converted into production order?
Explain how can you create production order without routing and bom?
How the processing time is calculated in a wc when both labor, machine categories exist?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is time phased Planning?
How to insert an inspection checkpoint at the end of an operation?
What is the purpose of using capacity planning?
What are gaps? Some examples?
What is processing class, where we do them and why?
What is mrp list and what is the use of it?
What is MRP procedure
What is a ‘work center’ in pp?
Steps to configure Production order type.
Mention what are the keyfields found in mrp view 1?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?