State 5 different method of level measurements.

Answer Posted / usman

1 guage glass
2 dip stick
3 pressure transmitter (open tank)
4 diff pressure transmitter (close tank)
5 radar type
6 displacer type
7 ultra sonic waves
8 capacitance probes

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com

2647


please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com

1751


Can any one tell me what type of question asked for instrumentation and control interview panel??? pls mail ramashankar.goel@gmail.com

981


What is the Working principle of Dozing valve?

2289


give me all the details about the interview and which type of question being asked

2301


sir, i preparing hpcl,ongc,barc,hal exams(instrumentation engg)pls send a placement papers

2397


use of split range ? where it is used ? in which control loop it is used ?

2045


What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.

2297


can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know

2198


Question on maha cement

808


plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}

2408


hye SAM acn u send your e mail id, so that i can solve my query through e mail?

2349


Questions on flow meters,few questions on HART protocol,

2089


Sir,I am going to sit for IOCL written test exam. recently.Can anyone tell me the name of 'Objective type Question Book on Instrumentation Engineering ' which will help me. Pl. mail to bidyut_71@rediffmail.com / bidyut.saha2008@indiatimes.com / bidyut.saha09@yahoo.in

2150


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2263