If a steel ring is 40 cm square and it's hooks are 8 dia of bar. The steel is 8mm. What is it cut length?
Answer Posted / eakub.molla
=40*4+9*.8=160+7.2=168cm
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
why is the column design?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
how many types of survey and what are levelling instrument?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
Which is the direction of negative angle?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
what is the maximum number of course that can be laid according to IS code and the max height.
Which are the top apps for you civil engineer?
how do you stabilize a waterlogged area in road construction
what is pqc
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is a well