Build is going to be delivered in another 30 mins.At that time
you have find an critical failure. What will u do ?
Answer Posted / vivek mudgal
I would share my findings with my PM or my stakeholders. I would leave the decision on them whether they stop the build or just provide the patch after get it release.
The main point is that we should not hesitate to share any of our finding at any time.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to connect oracle with test director? in testdirector we will be getting only reports? pls answer Thanks in Advance
How a test engineer will convince a test lead when he didn't approve the bug as a report ???
Explain the manual testing process?
Hi, I am planing to give ISTQB - Foundation level exam. Can anyone forward the ISTQB materials at laxmi_002@rediffmail.com mail ID.
Hi, what do you mean by internal auditing? what are the things they do in internal auditing?what they review? THNX in Advance
Why is it impossible to test a program completely?
What are the cases when you’ll consider to choose automated testing over manual testing?
can anyone tell anyone is providing training for CSTE exam in bangalore? and can u send some links related to this?
What is un-installation testing?
what is conditional testing? explain and examples
How does quality control differ from quality assurance?
What is bug priority?
There is an opening in our organization Sierra Atlantic, Hyderabad. All Manual test engineers with 2-3 years of experience can forward your resumes to mah_cs82@yahoo.com before May 01, 2008. (Only manual testers) with a covering letter, current CTC and Expected CTC.
what is diffrence between dynamic black box testing and dynamic white box testing
Can you explain calibration?