Answer Posted / nams
It is just snapshot of runtime data as per business requirement
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is the difference between datastage and informatica?
What are stage variables?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
what is ds administrator used for?
How do you import and export data into datastage?
What are the steps needed to create a simple basic datastage job?
Explain usage analysis in datastage?
What are the different kinds of views available in a datastage director?
what is stage is used for below Input columns: dept|mgr|employee|salary Output columns: mgr|count of employee per mgr|avg salary per dept note: each dept has one mgr and each mgr has many employees
How do y read Sequential file from job control?
What is the difference between passive stage and active stage?
how to run a sequential file stage in parallel if the stage is used on the TARGET side
DB2 connector> transformer > sequential file Data will be exported into a csv format in a sequential file. This file will be send in a email using a sequence job. Problem here is, how to avoid sending a blank csv file? When I ran the job there are chances that it might return zero records but in the sequence job csv file is going blank. how can I avoid this? thanks
What is the difference between validated and compiled in the datastage?
What is difference between symmetric multiprocessing and massive parallel processing?