you are a civil engineering student so what you have done to
improve your knowdge
Answer Posted / geetha ponnuru
Apart from classroom learning,a civil engineer particularly needs practical knowledge. So without relaying completely on faculty,I, myself tried to understand the mechanism of the things going around me.In this process I have gained some knowledge.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
how we check the thickness and line of ceiling plaster.
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
How will be cutting in timber plate size 600*400 column size
Explain what is structural frames or systems?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
how do we design mix ratio?
Define What is an ice dam sock?
pls mail some more tecnical qustions at msaranya2610@gmail.com
what is the minimum cement content for M20 & M25 as per is code -456(2000).
What is 1/8 on the architect ruler denotes?
what is the maximum number of course that can be laid according to IS code and the max height.
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?