What is the meaning of burden and class of accuracy of CT?
Answer Posted / poorvalingam
1.Burden is the actual load can handle by the C.T in (KVA)
Eg: the C.T need to operate the relay for fault tripping if the relay has 12 Va means the C.T burden must be greater than the relay load to over come the cable loss. it may be 15 va C.T enough
2.Accuracy class means , it says the % Errorof the C.T from no load to 120% of load for metering purpose and above the full load current for Protection C.T
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
why ups rating in kva? and why ups are in parellel?.why isolation transformer is used in ups?
Explain the fundamental difference between emf (electro motive force) and pd (potential difference) ?
role of europe union in UK safety legistlation (electrical safety)
how can we select the appropriate VCB ?
I need to connect a synchronous generator to the grid using automatic synchronization and two circuit breakers (one for synchronization, one for end connection to the grid), how to determinate the required diameter of the cables?
for what purpose the star point is done in ct
What is the disadvantage in proportional controller?
i have some screw comprressor with 630kw power,i have established them with simple star to delta circuit,by the way there is so much inertia when the screw comprressors start, can you offer me contactors power with 400vac or any cataluge to choose the contactors
Why an ac solenoid valve attract the plunger even though we interchanges the terminal? Will the poles changes?
What will be the fault current of any system when its generation is 10% of BASE generation( FUll Load )?Will is 10% or the same as full base calculation?
is oil viscosity affect on motor current?
please send the IS strandard for electrical to sakthi_murugan86@yahoo.co.in
explain me the relation between torque, frequency,speed,voltage and current in the 3 phase induction motor?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
66kv under ground cable how to layaing in ground any special case two ckt r runing