calculation of cement bags in 1:2:4 concrete mix
Answer Posted / kapil
1+2+4=7 total of 1:2:4 , then dry volume of concrete is 1.52
so 1 cubic meter is 1*1.52=1.52
then 1.52*1/7=0.217 cu meter cement
30 bag in 1 cu meter cement
than 30*0.217=6.51 bags ,
than sand is 2*1.52/7 = 0.434 cu meter
than metal is 4*1.52/7 = 0.868 cu meter
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I need model question papers for writing the Dubai municipality exam,for G+1
How to calculate carrying capacity of the existing water supply trunkmain
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
How do you change a dimension value in solidsworks?
what is called the inverd level of mabhole chamber?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
How do you calculate load bearing capacity of a waffle slab?
What is GSB gradation
How to make tiles floor step by step procedure?
What is a projection line?
Why should appointment store person for project ? what is the benefits for company ?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
How much time Required for PPR pipe network testing