Advantages and Disadvantages of using fly ash bricks over
clay bricks?

Answer Posted / mohan kumar

Flyash bricks have good compressive strength and density and so no issues of getting wall/ building weaker.
absolutely low cost and faster construction.
Appealing finish and colour.

Is This Answer Correct ?    22 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do you calculate the power of centrifugal pump?

647


Difference between pre-tensioning and post-tensioning.

682


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2142


what is the types of surveying?which type of survey carrying for type of work?

1674


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1943






what is the permanent solution applied for restoration of leaning tower of pisa?

3058


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7050


at which depth the construction of tunnel is economical from cost and engineering aspect.

1312


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

4870


psc girder detail

2712


Define What is an ice dam sock?

693


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

3317


trapozidal

2003


what is the design procedure for building

1758


How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?

1195