for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
Answer Posted / nilesh jain
525 bricks ( with wastage ),1.35 bags of cement, 0.27 cum sand.
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Material calculation of cm 1:6 for 1sqm
how can we calculate steel value, depending on load
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What are the disadvantages while using stone dust as filler in pavements?
What is semirigid connections?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
pls mail some more tecnical qustions at msaranya2610@gmail.com
What is the strongest bridge for a school contest?
what is stressing
How to calculate the load of partion in flat slab if we use brick?
roll of DLC in road constructions
What is the sugested procedure of water purification for public supply?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
What is the cemnent ratio