Can we create a sales order without plant? Is plant is one of the parameter to create a sales order?
Answer Posted / kevin patel
Hi,
This is a Case based scenario:
Service & text items will technically not require a Plant.
as far as SAP tracking.
Document type has to be configured in such a way that the in completion procedure allow the order to be saved.
Item category configuration has to be billing relevant or not (This again goes with your scenario).
If item is not deliverable, there is no need to physical delivery.
Item billing should be order related so that we can work without a physical delivery document.
There can be other scenarios which are not covered but yes it is possible, if you just want to create a sales order without a plant.
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
Is it possible to assign two different sales organizations to the same company code?
Is it possible to perform an availability check based on the plant yet exclude one storage location?
List a menu path to access stock requirements lists?
Explain the process flow for a standard sales order.
Can one business area be valid for several company codes?
how you can include condition type in the pricing procedure?
Wht is bill of return? wht is the implications of creating this on another modules like MM FICO etc in integrated way? expalian steps with transaction code to verify this implications in modules like MMand fico Wht is make to orders? wht is the implications of creating this on another modules like MM FICO etc in integrated way? expalian steps with transaction code to verify this implications in modules like MMand fico Wht is consignment? wht is the implications of creating this on another modules like MM FICO etc in integrated way? expalian steps with transaction code to verify this implications in modules like MMand fico
Could anyone explain to me how you were processing the 812 in SAP meaning how would you post your 812 credits? So, 850 creates orders in SAP, what about credit/debit - how do they post in the SAP?
If question will arrise that are you any project,because I am a fresher in sd but I have shown 1 yr of experience. So can I say I'm in implementation or support project?
What are the responsibilities of a technical consultant in an implementation project?
Can you share master data between several sales areas?
Have you worked on interfaces? what are the?
In R/3 we can represent a company's structure by defining and assigning corporate structure elements. What is the purpose of doing that?
what is application key in account determination where its mentained. plz ans its urgent
If you want to create language specific sales texts for your material master, would you have to create a new material master record?