if there are 3 clients in quality(100,200,300) and only two
clients in production(100,200) , how many clients will be
there after system Refresh ?
Answer Posted / vinay
first we have to export the client 300 from quality system and make it transport and release to production system , please do't do import in production. restore DB from production to quality and make system up and running and then import the exported client in SAP.
(or)
System Refresh the concept of making the quality system as production system. During system refresh we just copy all the datafiles of the production to quality. So obviously quality will be having 3 clients as in production.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain what is luw (logical unit of work)?
If a background job runs more than the time it should be completed normally then what actions will u take?
What is process for applying patches?
What do you understand by executing background jobs in sap system?
How u will give new authorizations?
What is a support package?
Is there a way to perform sapgui 640 roll out using a centralized server?
Mention what is the purpose of table usr02?
Explain deletion flag?
What is the difference between st06 and st03?
TMS Configuration?
Explain checkpoint?
How to make security authorization reports?
What is SSO? How to configure SSO?
What is ocm and how to apply ocm patches?