1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / mirza
M2.5 (1:6:12)
volume=1+6+12=19
total volume of ingredient for using=1.57
volume of cement=(1/19)*1.57=0.082cum
volume of cement=0.082*1440=118.08kg
1 bag of cement=50
actual bag of cements=118.08/50=2.37 bags of cement
volume of sand=(6/19)*1.57=0.495cum
volume of stone=(12/19)*1.57=0.991cum
no of brickswith mortar 10mm=405
no of bricks without mortar=500
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
How much quantity of cement,sand,stone used to build 1 cum of cc road??
what is grade intersection?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
Cement consumption of one cubic meter of aerocon blocks masonry?
What is the difference between absorption & adsorption and sorption?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
What is meant by autocad?
how to find out hard strata in bored pile when the DMC method adopted.
What is the strength of 1:6:12 mix?
What is the minimum size of the particles of silt soil?
What is meant by solid geometry?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
Name the main components of a cad gui?