How much kg or MTs of steel is required for construction of the building of 1000 sqmt.
Answer Posted / surajitg
There is no short cut or thumb rule for any such question. You have to provide the minimum data at least. Whether it is a column structure or load bearing wall. What is the foundation type etc.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
how much to get of BRC lapping in full yield and half yield ?
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
what would be the design load of R.C.C Cooling tower per cell.?
What is the difference between EPC,DBOOT and BOOT.
In cement making,what is meaning of blend,fineness,density.
Define What glue is least sticky?
What is thumb rule in quality and quantity estimation of a Residential building??
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?