Kindly furnish the relation between 7 days strength & 28
days compressive strength of Cement Concrete cubes. Can you
clarify whether the relation gets altered due to WATER-
CEMENT ratio?

Answer Posted / vinaysagar donakanty

The 7 days strength is help you to deshutter the shuttering for slab or beam. According to 7 days results we able co-relate the strength we will achieve the strength at 28 days. The lower W/C higher the strength.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the difference between replacement of cement by groundnut shell ash

3308


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

2236


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1898


plz.show development and anchorage length in simple diagram.

2640


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5529


VAT and CST ? Which benefits for buyer ? Why benefits?

1905


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

2107


HOw much % of premium on DSR-2013 currently

2051


please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.

2400


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1672


water leak detection system question & answer

2526


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

2558


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1842


please send me bhel questions on rupesh.017@rediffmail.com

2797


can i get civil engineering test papers.......?????

2550