Where should we terminate the shield and why?
Answer Posted / praful lilhare
on Power supply side we should terminate but i dont know why?
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
please send the drdo exam paper
In apron feeder how TPH is calculated?
What is the cascade control
What is difference of fanuc alpha series 16i and 18i controller.also what is differnce betn TC and MC controller
How d.p. Transmitter can be applied to close tank?
basic connection and principle of axial shift sensor n differential sensors in tubine describes n draw......
what is piezoelectric transducer?give an example in power plant n state its principle?
how many types of viberation transmitter and how to calibrate and where use of vibration transmitter
For crude application in floating roof tank, how to calibrate a DP Transmitter? How is the floating roof weight considered?
plz tell me clearly about PID.."when v have to change I value,D value,GAIN??
components of control circuit belongs to control valve
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
Hi Friends i am going to write BARC written test by this month 20th (20-5-2008). So please if any body knows the details about this or having previous question papers pls mail me to kkumarei@gmail.com. For Suggestions give one message to 9962122264
what is exact time to study dcs and plc cources
is motorized valve closed when power shutoff?