If MRP type PD/ND in material master how will work flow.?
Answer Posted / azhar
In MRP type PD material behave production and sales and
in ND the material behave mm flow
| Is This Answer Correct ? | 0 Yes | 8 No |
Post New Answer View All Answers
What is Backflush, the places where the backflush is used?
Explain what is routing in sap pp?
list the important tables used in pp.
What is the internal recruitment?
What is process keys
What is mrp list and what is the use of it?
What are the reports generated in product cost controlling information system?
SPRO path for order, confirmation or requirement class.
Special Procurement type 40 – proc. form alt. plant
what are Standard keys
what do you mean by opening periods
Mention what is the difference between stock transport order and stock transfer order?
How to create object dependencies in a bom for a configurable material?
How are time management and payroll are integrated?
What is MRP Area or How can I excluede one storage location stock from MRP?