how to find number of 16mm bar reqired for 5m length with 125 mm spacing ?
Answer Posted / vikas d v
it is simple 5000/125=40no+1(extra) of rods there is nothing to do with length of rod
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is a kip?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
what is the clear cover for shearwall?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What are the uses of groynes?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
how much to get of BRC lapping in full yield and half yield ?
What are segregation and bleeding?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
Define the various stages of the project planning process in construction.