Answer Posted / s t gokhale
I think ,span of time for which the maximum power is used is also important while defining contract demand. In Maharashtra state, maximum demand for a continuous span span of 30 minutes is recorded in the meters and billed as contract demand.
| Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
What do you mean by a voltage transformer?
what is mean by parallel operation of permanent magnet generators
how to calculate the tarriff for an industry whose kva demand is 10 mva
CBCT selection
dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.
Define de-sensitivity?
what is the diff. between x'mer , isolation x'mer & ultra-isolation x'mer ?????????????
HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?
What is Auto Mains Failure Panel & Auto Synchronizing Panel
how to produsing geretor power
What are n circles?
Dear Respected sir how to test ABB REX521 protection relay by relay tester.
I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.
what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero
What is the disadventage of gland earthing(power cable) if any. ?