Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is maximum demand and contract demand?

Answer Posted / s t gokhale

I think ,span of time for which the maximum power is used is also important while defining contract demand. In Maharashtra state, maximum demand for a continuous span span of 30 minutes is recorded in the meters and billed as contract demand.

Is This Answer Correct ?    0 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do you mean by a voltage transformer?

1220


what is mean by parallel operation of permanent magnet generators

2041


how to calculate the tarriff for an industry whose kva demand is 10 mva

2034


CBCT selection

2325


dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.

1421


Define de-sensitivity?

1192


what is the diff. between x'mer , isolation x'mer & ultra-isolation x'mer ?????????????

2414


HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?

2159


What is Auto Mains Failure Panel & Auto Synchronizing Panel

1996


how to produsing geretor power

2255


What are n circles?

1139


Dear Respected sir how to test ABB REX521 protection relay by relay tester.

2798


I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.

2187


what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero

2322


What is the disadventage of gland earthing(power cable) if any. ?

2186