How do you implement scheduling in Informatica?

Answer Posted / subhrangshu

We can use Scheduler option in Workflow to schedule the entire mapping.
Also, if we are using any central scheduler tool for this purpose, we can create a command file with PMCMD to run the workflow and schedule execution of that command file in a scheduler.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the differences between a connected lookup and unconnected lookup?

638


What is the difference between a repository server and a powerhouse?

798


COM components can be used in Informatica

1861


difference between repository database and repository service?

610


What does refresh system mean, and what are its distinctive choice?

560






How do you change a non-reusable transformation to reusable transformation?

586


What is lookup transformation?

577


How can you generate reports in informatica?

565


Explain the difference between a data warehouse and a data mart?

590


What is a shortcut and copy in Informatica and how two are different with each other?

668


in u flatfile some of fact records are missed then u load the diminision records are not if u load diminsion records what about fact table records

1726


What are different types of transformations available in informatica?

575


What is informatica worklet?

597


Explain joiner transformation in informatica

655


how to create user defined function (udf) in informatica

774