While calculating quantity of cement required for 1 qubic meter
If mix is m25 1:1:2 =4
1.52/4=0.38, 0.38x1440=547.20 kgs
I know 1440 is unit weight of cement
And what is 1.52 ?
And some one using 1.54 and 1.53 etc...
Why they are using can u explain me what is 1.52, 1.53, 1.54?
Answer Posted / ramadurai
1.54=1 m3+w/c 0.54=1.54 m3
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
How many pyramid in egypt?
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
What is the use of extruded feature in solidsworks?
how to remove the quantity of metal 1 and metal 2 in concrete
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
What are the basic use of runners and standards of pipelines?
How can we demolish concrete beams?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
What is M40 _ TOR - EQ and B.F.S
how much shouid be the rate for ready mix concrete per cubic meter
What are the different methods for drawing an arc?
What is meant by dimensioning?