What is the rate of earthwork excavation?
Answer Posted / arun
210
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Why are steel plates inserted inside bearings in elastomeric bearing?
If specific gravity of cement is less than 3.15 what is the cause?
What is M40 _ TOR - EQ and B.F.S
How to build the floor to ceiling bookcase?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
how to tie 10 legged stirrups
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
Explain what are the phases inspections are done by local authority while construction?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
how to do cementicious paint for rcc walls of cw pump house
how to prepare site mix design
During reclamation how can the occurrence of mud waves can be rectified?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
how to disign cuplock shuttering and it's matireal requirement snd any related web site