Answer Posted / deepak
Side of cube should be minimum 4 times of aggregate's size.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
How do you compute the volume of airflow?
what are the types of dimensioning?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
What does civil engineering mean?
What is the method of soil replacement test?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
calculate the quantity of water for 1:6 cement mortar
How to compute minimum number of columns required for a site from area of site?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
how to calculate the size of triangular ring in rcc column?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
Civil engineering related
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.