I am working in a process industry, in that there are
several sections devided in the SCADA screens and
individual sections may START independently. But sometimes
i am facing problem i.e, if section 2 Stopped by the
operator immediately Section 1 or Section 3 or Section 4 is
getting stopped can you expain the reason behind this?
Answer Posted / jigs
It's possible if all sections are in operational interlock. If you stop one then other will be stopped.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why I need valve guard and whats different between guard and positioner ??
I have completed B.E. Instrumentation & control in 2009. i have 3 year industrial job experience in chemical plant.now, I want to join M.E. in external. so, Plese say easiet way and good institute name.
Linear amplifier.
How is flow measured in square root?
how can i check vortex shedder bar it is ok? if there is ohms condition are shown correct?
Difference between ultra sonic flow meter
What is Erosion in a control valve?
Sir , i have completed my M.Sc In Instrumentation and presently working in Maintenance department 3 yrs Exp , is there is any possible for work in offshore ..
sir, i preparing hpcl,ongc,barc,hal exams(instrumentation engg)pls send a placement papers
What is the diffrence between ff tx and non ff tx
Why do we floating DC in DC system.
why we us isolation barrier in hazardous area how it works to protect the area and please clarify its current flow.
䑰ҕ䔈ҕ䖠ҕ䘰ҕ䛀ҕ䝐ҕ䟐ҕ䢐ҕ䥐ҕŹ
How to check vortex flow meter is in good condition while we do not having calibration setup?
what are the different types of Protocols? & their applications.