Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

under which situation or why restricted earth fault protection operates in out side its zone that is external fault

Answer Posted / hg

1) if any one ct saturates at through fault current due to
a) high harmonic content of current in through fault current leading to high voltage appearing across secondary and the ct saturates

2) under above scenario if there is no stabilizing resistor/ damage to stabilixing resitor than relay may operate

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3420


what is the basic use of power plant in equipment

1772


what is the meaning of SST300 V56A in SIEMENS turbine

4372


How to calculate power press toneage

2080


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1718


what's the moog valve

1520


why do you consider yourself a suitable candidate for this position

7464


what is the difference between compensated & normal drum level in boiler drum?

1818


can dp type level transmitter work in under vaccum condition

1998


How We Calibrate the vaccum transmitter?

1982


Why superheated are started before I'd and rd fan?

2198


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2302


By any way can we increase the B check hours from 300 to 500

2215


What is difference between secondary Air & Tertiary Air and Their use.?

2013


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1014