how much binding wire required per tonne slab beam columns
Answer Posted / ashish majumdar
It is around 7.5 kg per MT of steel
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which percentage of carpet area use in plot area of office building.
What is the different type of slump test indications?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What is the strength of cement?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
pls give me ans to ACT formula cube testing porpuse
what are the values of compressieve strenght?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
What is Heavy Concrete & Normal Concrete
residential buildings,mixing of concrete,structural,construction material,site handling.
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
material used for mendrel use to bend epoxy coated rebar
how to calculate quantity of bricks in circular manhole with examples.