You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / suresh baria
Bring it to notice of structural engineer, Let him to give the corrective measure as he is the design auther and he is going to give the stability certificate.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
Differentiate orthographic and isometric projections?
where i can get material costs on weekly basis
Why nautical mile is different from statute mile?
In earth work 1300 cum soil how to calculate how many liters require in water
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What are the applications of the modulus of elasticity?
how calucate cement sand ratio for plstering
How do you determine specific gravity of cement?
Which architectural movement is also known as jazz moderna?
Why steel rods are produced only in even dimensions?
very simple or less time consuming formula for reinforcement calculation by moment
What is the material consumption- cement,sand,tiles etc for Toilet dado?
How can you achieve soil enforcement?