You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / suresh baria
Bring it to notice of structural engineer, Let him to give the corrective measure as he is the design auther and he is going to give the stability certificate.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
explain what do you mean by the property development.
how to control PQI (Project Quality Index)
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
what is the list of building construction equipment & teir output?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Explain creep?
What are the applications of cad?
what does the track parameter mean in staad.pro?
List out the types of roofs?
What is fineness modulus ? and its sieve # ?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
how many shuttering material required for 1000 sq.m built up area.
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)