You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?
Answer Posted / prashanth
Depends upon the site condition.
Wheather it is in a basement depends.
please consult with your designer,because depends on FOS.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to caliculate required amount of cement and sand required for 1cu.m.
Write short note on construction programme for pile foundation.
How to testing voids of filled aggregate in bitumen mix design
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
how u design STAGING for Superstructure in BRIDGE construction?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
What do you mean by tolerance factor of concrete ?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
What is aggregate?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is the exception critarea of cube?
why is M30 grade Concrete use for Foothing & Column M50