what is commissioning & pre commissioning , explain with
difination
Answer Posted / kalpesh g patel
Commissioning is the start up of the equipment for the first time. It is when you run the equipment and carry out tests to verify it is running as intended i.e. to design specifications. Commissioning tests are normally run against a design data baseline. Commissioning also includes things like checking oil levels, fluid levels, temperatures, pressures and for general issues that are contradictory to the intended correct operation of the equipment.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calibration coriolis flow meter?
how to measure draft pressure in transmitter pl. give its single line digram
What is force balance principle? State some of its’ advantages.
What are the maximum packet size of: a) HART b) Profibus DP c)Profibus PA d) DeviceNet e) Foundation Fieldbus
OBJECTIVE TYPE QUESTIONS OF ANALYTICAL INSTRUMENTATION
Where is wet leg is used?
How to Calibrate Temperature Switch in field
For crude application in floating roof tank, how to calibrate a DP Transmitter? How is the floating roof weight considered?
Difference between 2-Valve Manifolds, 3-Valve Manifolds and 5-Valve Manifolds 3 with diagram
Hello to all....I am an Instrumentation Graduate and i am passed out in this year only.. I am unable to find the job in my core instrumentation.. so any boby tell me how to and where to search the job....please...and also tell me i there are any courses offered in the instrumentation stream so i can do it... you can send your suggestions to my mail-id i.e Ganesh20084u@gmail.com ... please..
how can leve transmetter calibate in feild .and also put cv and flow plz .....
How to check vortex flow meter is in good condition while we do not having calibration setup?
May I have a brief note above the voltage barriers? Whats is the purpose? Please mail me if you've operational details, mail id: rajkumar.diice@gmail.com
when placing a vent or drain hole on an orifice plate should you measure from the center of the bore up or down for the vent placement?
What is super thermocoupal?