how to find number of 16mm bar reqired for 5m length with 125 mm spacing ?
Answer Posted / zaid
number of rods = (length/spacing)+1 = (5/0.125)+1
= 41 numbers of 5m of 16mm are required
to find how many full rods i.e 12m are required
= (41no*5m)/12
= 205m/12m
= 17numbers of 12m
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
Special thing in designing a overhead reservoir ? which is different from an ordinary design
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Define What are the reasons for geotechnical site investigations in Uganda?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
rate analysis hiring of generator 62.5 KVA