how to find number of 16mm bar reqired for 5m length with 125 mm spacing ?
Answer Posted / jarun
40
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
How to build the floor to ceiling bookcase?
Why should appointment store person for project ? what is the benefits for company ?
What do you mean by the word 'shear'?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
what is the exact dia of 8swg and 10swg gabion wire
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
Ratio for 4500 psi concrete
What is need for setting limits?
How to calculate material and labor required for 100 m2 plaster?
What are the reasons for geotechnical site investigations in uganda?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?