What is the difference between lap splice length and
development length of rebars?
Answer Posted / c.kumar
Splice length is required prior to transfer the load from one bar to another bar and also to minimize the Bending Moment but the develoment length is added to reinforcement in order increase the R.C.C design and bonding strength b/w steel & concrete.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
I need model question papers for writing the Dubai municipality exam,for G+1
How high should the water tank be to provide a 60 psi at base of this water tower?
water leak detection system question & answer
Which IS Code/American Code applied for coupler test of steel
Why joints are provided?
What is the development length given in pile?
What is the crank length in the slab?
The mixture of different ingredients of cement is burnt at?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
door and window wood work calculations and different methods
Formula for calculation volume of essentric footing
What ingredients with% found in ppc cement??
how can we calculate steel value, depending on load
how much cost of single coat 20mm thick plastering per sqre meter
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.