What is the difference between lap splice length and
development length of rebars?
Answer Posted / c.kumar
Splice length is required prior to transfer the load from one bar to another bar and also to minimize the Bending Moment but the develoment length is added to reinforcement in order increase the R.C.C design and bonding strength b/w steel & concrete.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how is the reinforcement is distributed in triangular slab
What is the diff between cad & cadd?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
Which are the top apps for you civil engineer?
How to do bbs in excel format
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
What are new methods /technologies of pothole patching?
how much cement sand n bricks required in im3?and how much in plaster?
What is reinforced concrete?
Describe the sections included in a typical bill of quantities
what is difference between fluidity and workability also how palsticizer works
what are the code used for residental building?
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
Describe a time when you anticipated potential problems and developed Preventive measures
strength vs shape factor