What is the difference between lap splice length and
development length of rebars?
Answer Posted / c.kumar
Splice length is required prior to transfer the load from one bar to another bar and also to minimize the Bending Moment but the develoment length is added to reinforcement in order increase the R.C.C design and bonding strength b/w steel & concrete.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is mc arther pile?
How much cum. Brick work can do by 1 madon
How to calculate material and labor required for 100 m2 plaster?
how i can tak Quantity of mortar in block work
as per is code, what is the minimum content of opc and ppc cement for rcc structure
Consumption of Binding wire for fixing of cover block in vertical surface
to draw bm diagrams for portal frames under different loadings//
how statics is different from dynamics
What are the strongest shapes in building?
how to nfind out the specific gravity of sand.aggregate,water please help...
Test procedure of fly ash bricks as per code ?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
Is there the dry coefficient of cement is constant?
what is the method used for marking of cantilevers in hirise buildings by using theodolite