what"s the responsibilities for QC(quality controler)in high
rise buildings?
Answer Posted / ksrao
Monitoring all the works stage wise maintaining
ITP,QAP,QMP and maintaining all records related to QC.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the layers of the national and heir aprox thickness??
what will happen if one could not properly follow the spacing of slab reinforcement bar?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
why the openings of sieves are square io size?
what is floating slab foundation?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
Consumption of Binding wire for fixing of cover block in vertical surface
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
What is the distance between railway tracks?
can i get civil engineering test papers.......?????
Give me an example of a time when something you tried to accomplish and failed.
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
How high should the water tank be to provide a 60 psi at base of this water tower?
Is there the dry coefficient of cement is constant?