what"s the responsibilities for QC(quality controler)in high
rise buildings?
Answer Posted / ksrao
Inspection of works three 3 stages
Pre construction : input materials testing
During construction : cocrete- w/c ratio cubes casting ,Brick work - proportion of cm,joints etc
Post construction:finishings, levels,testing of strengths with CTM,core cutter,NDT tests
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain the different types of roofing systems?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
What is c.g.i sheet which used for roof??
pls give me some basic informations in construction of a structure?
cement and sand required for one block of size 0.23*0.15*0.46
Define current ucs?
pls tell me about method of cutting length of ties column
Why joints are provided?
Explain what is progress payment?
Why nautical mile is different from statute mile?
what are the types of dimensioning?
Gidc technical que paper
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
Why should pumping be not used in case of concreting works?