what"s the responsibilities for QC(quality controler)in high
rise buildings?
Answer Posted / ksrao
Inspection of works three 3 stages
Pre construction : input materials testing
During construction : cocrete- w/c ratio cubes casting ,Brick work - proportion of cm,joints etc
Post construction:finishings, levels,testing of strengths with CTM,core cutter,NDT tests
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Why should you show Client/Engineer activities clearly on the project plan?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
what is tension footing?
Why was the empire state building made of steel?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
When was the first motorway built in england?
What is meant by cad?
what is the use in canals of longitudinal drains and cross drains in lining areas?
How many cum of 9.5mm stone in 1 ton ?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
Consumption of Binding wire for fixing of cover block in vertical surface
What ingredients with% found in ppc cement??
How many square meter can a worker/labor demolish a structure per day?