What is gap

Answer Posted / dines kumar

GAP Analysis is of finding difference between AS-IS and
TO-BE. It is carried out to know which areas are remaining
untouched as far as project is concerned. In short GAP
Analysis provides documentation on areas that still needs to
be worked out.

Please correct me if I am wrong.

Is This Answer Correct ?    14 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the stock requirement list and their uses.

574


What are the production process in sap?

597


What is the difference between the fixing type 1, 2, 3, 4?

5179


Explain customer Independent requirement .

1670


Why is work scheduling required for semi finished and finished products?

571






What is Backflush, the places where the backflush is used?

1651


Mention what are the production process in sap?

607


What is costing? How it is affected the pp?

643


Steps to configure Production order type.

1016


What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?

733


Explain how can you create production order without routing and bom?

598


Integration between PP and QM Module.

1325


Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN

4301


What general data appears on basic data screen?

649


Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?

1212