Tell me important of the Production scheduling profile what are the things have to maintain in this profile

Answer Posted / dinesh kumar

PSP--- Production Schedulng Profile are set of controls asigned to a Material.

What are the controls

Order Release with the Creation of production order .

Scheduling with the Order Release

Auto Goods Receipt

Capacity Profile

Automatic Batch creation with the Production order for the header material

Order type for the system to select When we convert the PLanned order to Prd order.

These some of the generic controls associated with PSP.

Is This Answer Correct ?    12 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can we have more than 6 standard values in standard value key?

600


Explain the mrp controller and their uses.

605


What are the parameters are there in Order type or in dependent para. config?

1100


What are some important tables used in pp (production planning)?

595


Explain what is the need of mrp list if the stock requirement list is already given?

621






What does a PP Consultant do in his/her real time?

2340


How to attach a drawing for a material to bom ? Is it possible ?

621


What is primary cost and secondary cost?

1247


what are the settings needed for variant configuration?

1436


How you get the ticket?

639


How to create PRT master record?

1518


Define mrp group

646


One component we can assign to workcenter at routing

2353


what does SAP business workflow do?

1624


What is the transaction code to run MRP for sales order?

1650