Tell me important of the Production scheduling profile what are the things have to maintain in this profile
Answer Posted / dinesh kumar
PSP--- Production Schedulng Profile are set of controls asigned to a Material.
What are the controls
Order Release with the Creation of production order .
Scheduling with the Order Release
Auto Goods Receipt
Capacity Profile
Automatic Batch creation with the Production order for the header material
Order type for the system to select When we convert the PLanned order to Prd order.
These some of the generic controls associated with PSP.
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
Can we have more than 6 standard values in standard value key?
Explain the mrp controller and their uses.
What are the parameters are there in Order type or in dependent para. config?
What are some important tables used in pp (production planning)?
Explain what is the need of mrp list if the stock requirement list is already given?
What does a PP Consultant do in his/her real time?
How to attach a drawing for a material to bom ? Is it possible ?
What is primary cost and secondary cost?
what are the settings needed for variant configuration?
How you get the ticket?
How to create PRT master record?
Define mrp group
One component we can assign to workcenter at routing
what does SAP business workflow do?
What is the transaction code to run MRP for sales order?