Why is DPC not provided at sills of doors?
Answer Posted / ravi
bcoz its provided for the dmapness which comes from soil moisture or ground water.
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
Under what circumstances should pot bearings be used instead of elastomeric bearings?
How high should the water tank be to provide a 60 psi at base of this water tower?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
I need to constructive work in amaraj batteries
Which are the top apps for you civil engineer?
how to control PQI (Project Quality Index)
what is parametre for M25 after 7 days strength
The 4 main factors to start a construction project are––
as per is code, what is the minimum content of opc and ppc cement for rcc structure
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement