What is the Steel bar spacing formula for Concrete Slab?
Answer Posted / omar
(Area of steel-required- /1000) = (Area of one steel bar/S)
find S
then:
the answer will be ΦX/ each S
| Is This Answer Correct ? | 19 Yes | 7 No |
Post New Answer View All Answers
How much cement will require for 1Rmt Skirting laying
will fix foundation bolts at site with out template is there any procedure?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
What difference comes in constructing of house and a housing complex like society
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
how many type of admixtures for water stored structure?
what is the difference b/w full length and cutting length?
how much cost of single coat 20mm thick plastering per sqre meter
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Explain major differences between routing maintenance and major maintenance.
how much of the strength comes from post-production curing
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?