deshuttering time for RCC for DPC over the foundation.
Answer Posted / amit
for side shuttering=1 day
but as per is 456-2000,Bottom deshuttering of slab and beam are done when Concrete achieved 65% of its actual ulmimate strength.
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is education Cess.
what is polity
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
can stub column take the load as main column
What is the biggest dam in america?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
what is Short bored pile foundation.
How to calculate chejja reinforcement
What is reinforced concrete?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What is a projection line?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What are the types of slump?
How to calculate the force on a column of three story building. What should be the base concrete height?.