What is the reason behind 11kv 33kv 132kv.....means
multiple of 11?
Answer Posted / engineer kaleem ullah
the most reasnable answr is that generation piont to end side of piont line voltage drops aproximate drop 10 then we sending 10 voltage extra like 100/110.......200/220......1000/1100
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
In Power cable specification what is U0/U and Um.
What is the Surge suppresor? Why using in a UDB's and How it works?
sail kaott diploma ece ke interviw me qus.kis parkar ke aate hai aur G.S me kya puchate hai kya sameedyaan me kis parkar ke qu.puchate hai
How to calculate the multiplying factor for energy meter with ct ratio given
can some one clearly explain why -48 volt DC use in telecom site????
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
Hi I'm doing my MBA(3rd semester).I applied for the post of ET conducted by BHEL the last year.I cleared the written and lost in personal interview.Again I wrote the exam this time and cleared the written n yet to take the personal interview.Shall I disclose in the interview about my studies.What shall i say if they ask about my change from studies to job
What is VCB? where it is installed at SP. What is SP?
During FEED, you will have all the information with regards to cable. How will you calculate the MTO for MV and LV Cables? what are your considerations?
What is excitation in case of dc motor?
How can we calculate the transformer rating if the load calculated is 1000KW (11Kv Supply)?
how to get electrical supervisour certificate in gujarat
What was the Dg set radiator and lube oil temperatures trip in ACB
As an electrical engineer what are the responsibilities which i can hold in TCS?
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.