How to find out the quantity of steel FE415
Answer Posted / xevier
(sq of dia / 162 )*( number of bar * length of bar ) gives the total quantity of steel.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define current ucs?
I need to constructive work in amaraj batteries
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Explain the design for rcc multi-storied building?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What things architect have to take care of before starting any project?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
What is command line?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
difference between fc and fc'?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
what is the service corridor?