9*8m slab 1:2:4 ratio use for M20 mix how much cent is
require it will become in cum but i want bags.
Answer Posted / johnmiya shaik
M.20 mix(1:2:4)
1 2 4=6
1.52/6=0.253333
(Cement wet density to dry density ratio)
(One cement bag=0.035cum/1.225 cft)
0.253333/0.035=7.238095
Slab area=72sqm
Assume thickness=100mm
So concrete qty=9x8x.1=7.2cum
Cement bags=7.2 cumx7.238095=52.11 bags/2605.714kg
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which ratio use for cement selery???
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
What things you need to take care of before building a kitchen island?
Which stone is best for wall construction Laterite Stone or Cement Blocks
What are the advantages of building a dam on the river nile?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
rate analysis for cement pointing 1:4 , for 100 sq m
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
What is soil enforcement?