The ff slab casted its thickness
100mm.2nd floor slab will be casting its
300 mm.how we shall be given suppot to
that 300mm thk slab.ple way me
Answer Posted / divusp
In this case, we can strengthen ff slab by giving props from gf so that ff slab can sustain over load coming from sf slab
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What are the applications of cad?
What is the best type of wood glue?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
What is the substitute of Mastic Asphalt?
what is escalation?how it is done?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
Define Workability ?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
how to calculate the scour depth
in design case of structural member best suitrable percentage of steel limit is what
dialation means
What is Architect-Prepared Contract?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
How do we determine the specific gravity of a cement?
Name the main components of a cad gui?