Answer Posted / gowtham1993
3-4 rupees it depends upon the area
1 load =12000
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
What is different between DI Pipe and CI pipe?
Explain the difference between shear and tensile strength.
what is the water-cement ratio of mix design while 30mpa in 7 days?
What happens to Load at yielding ?
what is mean by reestimation?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
What is Base Shear ?
Process of pcc in wateredug
3. What are the disadvantages of your present job, things you do not like about it?
How do you calculate load bearing capacity of a waffle slab?
how can we calculate steel value, depending on load
What is min thickness,min grade of conc & age of PQC ?
residential buildings,mixing of concrete,structural,construction material,site handling.