1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / sumit
bricks 480
cement 72 kg
sand 0.30 m3
| Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
which type of instrument included in plumbing work?name of instrument?
Explain major differences between routing maintenance and major maintenance.
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
what are the Task work of different labour.?
how to calculate quantity of bricks in circular manhole with examples.
why is the column design?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How to find permissible diagonal tensile stress in reinforced brick work
What type of tensile strength is handling by crank in beam? Thanks.
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??