Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate the no of bags required for 12mm thick 1:6
plastering?

Answer Posted / goutam giri

Considering 100 sqm plaster.
Wet Volume of plaster =100X0.012                                      =1.2 cum.
Add @ 20 % for filling the depressions, joints, wastage, etc.=0.24 cum.
                                 Total=1.44 cum.
For dry volume of mortar increased by ⅓ of volume             =0.48 cum.
Total dry volume of mortar                                                   =1.92 cum

Volume of cement:-1.92/7 = 0.2742/0.0347 =7.9 bag
Volume of sand:-0.2742*6 = 1.6452 cum

Is This Answer Correct ?    32 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate the scour depth

2908


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2060


What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

2423


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

2197


How to calculate 1 brss for RCC work  

2167


Why do you want to work here

2342


how much need sand and cement for 1 cft roof construction?

4431


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1946


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

2112


what is the minimum compressive strength of clay brick

2201


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

2817


On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??

3277


how much cement and sand consuptin in 4 inch siporex walls 100 sq ft

2978


Explain the latest method to detect a crack in a building?

1149


What is a projection line?

1164