There is 15 KVA UPS using for single phase load.And 30
batteries of 12 V, 100 Ah are connected in series. Load is
taking 15 A current.What will be the back up power for this
UPS on same load?
Answer Posted / k.prakashchandra
Is it correct that batteries are connected in series ? The stored energy in each battery is 12 x 100 = 1200 Wh. Total = 36000Wh . The load in watts = 230 x 15 = 3500W ( app ) . Back up = 36000/ 3500 = 10 hr(app)
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Define characteristics impedance?
In which of the following case, the rotating magnetic field is reversed? A regenerative breaking B plugging C dynamic breaking D forward motoring
Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.
What is the alternate solution for testing of polarity by using polarity tester while its milli ammeter does not works?
What is the most accurate way of testing ELCB?ELCB is better than RCD?
how invertor convert the dc into ac give brif detail
what is interfacing in computer studies?
i m doing DEEE in part time,can i join regular cources in BE,,IF i join what the cources can i select like (civil,ece,IT) ,,kindly advice
how to calculate cable size in diffrent loads?
Importance of fault current in power transformers and how to monitor the same? How is it different from winding temperature?
Does the motor power displayed on the Motor name plate is the mechnical power motor delivers or it is consumed power from the system?
what is effect of length of air gap on performance of dc motor and generator?
what are the applications of PLC?
Explain the different methods used in the choice of rotor slots for reduction of harmonic torques in an induction motor.
Can a generator runs after getting 1st stator earth fault.